Web(For more information: 12 Tables of Code) Name of Standards Organization: Bureau of Indian Standards (BIS) Division Name: Civil Engineering Section Name: Wood and other Lignocellulosic products (CED 20) Designator of Legally Binding Document: IS 4990 Title of Legally Binding Document: Plywood for concrete shuttering work - Specification WebThe quantity of Shuttering Required: 1. Plywood: Generally, the dimension of plywood used in regular construction is 8’x4′ and thickness is 12 mm. So plywood required = Covered area x Thumb rule = 1500 x 0.02 = 30 no’s. 2. Wooden Battens: Wooden battens required = Covered area x Thumb rule = 1500 x 0.04 = 600 rft.
Shuttering deduction as per is code
Did you know?
WebOct 22, 2024 · Solution: The quantity of the shuttering is to be done in numbers or in running foots. Plywood: 12 mm thick (8′ x 4′) = Covered area x Thumb rule. = 2000 sft x 0.02. = 40 No’s Ans…. Wooden Battens : (3” x 3”) = Covered area x Thumb rule. =2000 sft x 0.4. WebIS-CODES for measurement of building and civil engineering works IS 1200(Part 1):1992 Methods of measurement of building and civil engineering works: Part 1 Earthwork (fourth …
WebFeb 26, 2024 · 16 and above = + 3%. TOLERANCE FOR CUTTING LENGTH :-. When the specified length is not given= + 75mm (or) – 25 mm. When the min. length is specified= + … Web1. Vertical Formwork of Column, beam, and wall. 16 Hours to 24 hours. 2. Forms removal for Slab (Props has to be fixed immediately after removal of forms) 3 days. 3. Forms removal for Beams (Props has to be fixed immediately after removal of forms) 7 days.
WebISGPP Panchayats & Rural Development
WebMar 9, 2024 · The de-shuttering period mentioned below only holds good, if the following three criteria or conditions are fulfilled. Conditions: 1. The ambient temperature should …
WebKnife as per fig 1 of IS 1734 (Part 5) Stout table 5 Resistance to water test (Clause 10.1.3) Water Bath fitted with digital temperature controller Knife as per ISS Stout Table 6 Mycological test (Clause 10.1.5) Enameled Mycological Tray with Sucrose / Saw Dust 7 Plywood with plastic coating or overlay (Clause 10.1.4) Water bath cyndy thompson ifmaWebOct 25, 2024 · For wood shuttering price calculation, we must know the price of 1 litter shuttering oil. Suppose the one litter shuttering oil price is 300 Rs/-. Price = (Required oil) Multiply by (1 litter shuttering oil price). = 6.67 x 300. cyndy trefleWebFeb 7, 2024 · Code of Practice for laying in-situ Cement Concrete Flooring: IS2571:1970. Methods of tests for aggregate for concrete: IS: 2386. ... 6 Fixing of shuttering ply side as per the size given in drawing, or keep offset to the foundation at … billy love gaffney scWebFeb 25, 2011 · Shuttering and scaffolding are not mentioned under section 14 of the CST Act, 1956. Therefore, these items must be considered as unclassified items & hence taxable @ 12.5%. I have considered the arguments of both sides and am of the view that the shuttering and scaffolding material are not covered under heading of the iron and steel … billy loughnane ridesWeb(as per IS:9103), to modify workability & other properties without impairing strength and durability complete as per specifications and direction of the Engineer in charge. Payment for cement, reinforcement and shuttering shall be paid extra. Cum As per approved design mix 022050 Providing and laying in position machine batched, machine mixed cyndy taylor hinecWebAs per IS code rules. For small opening up to 0.5 m2 area, no deduction in plastering is made. For opening of size 0.5m2 to 3m2 area, deduction is made on one face of the wall. … cyndy\\u0027s alterations cincinnatiWebJul 1, 2024 · Formwork to secondary beams shall be measured up to the sides of main beams, but no deduction shall be Made from the formwork of the main beam where the secondary beam intersects it. Form work to beam shall be measured up to sides of column, but no deduction shall be made from the formwork to stanchion or column casings at … billy louise